AI transparency: articles and reports are produced with the help of artificial intelligence and checked through a process that does not constitute specialist validation. They may contain errors: verify relevant information with independent sources. Read the full disclaimer.
Nov 3, 2026 OQ Technology selected Momentus to fly its 5G NB-IoT payload on the Vigoride-9 mission, scheduled for launch in Q4 2027. AI-generated summary · Source: company release
U.S. listed: $MNTSSatellites and in-space servicesExecution and funding risks

MNTS Stock Hub: Momentus News, Vigoride and Orbital Services

Momentus develops satellites, components and in-space services around its Vigoride orbital vehicle. The September proximity-operations demonstration and NASA formulation task order are distinct milestones: one validates a sensor suite in orbit, the other funds preparatory mission work. June cash resources provide capacity for further development, while modest and uneven revenue leaves the commercial model to prove. The investment case depends on repeat missions, customer retention, operating economics and capital discipline, with dilution and mission execution central to the risks.

Last updated: November 3, 2026Market reference: November 2, 2026 regular-session closeFinancial period: Quarter and six months ended June 30, 2026Archive captured: October 31, 2026
Full research report · PDF
Momentus ($MNTS), archive captured October 31, 2026
16 pages covering The report examines Vigoride mission execution, the proximity-operations demonstration, NASA formulation work and the economics of hosted payloads. It distinguishes preparatory contracts from flight awards and follows the June cash reserve, operating consumption, financing inflows and the demands of repeat missions. The original research revision date is not stated; the date above records when this archive copy was captured. The hub follows later developments. For personal use only: redistribution prohibited.
Get the report (PDF)
Next company milestone
2027 mission windows

Vigoride 8 and Vigoride 9 missions; the November 3 OQ Technology contract places the Vigoride 9 launch in Q4 2027. Formulation tasks remain distinct from an implementation award. Primary source · OQ Technology contract

Company-guided windows remain forecasts; completed events are dated separately from the next operating or financial disclosure.
Momentus MNTS daily stock chart
Daily chart $MNTS. The chart link is an affiliate link. Interactive chart with bull and bear scenarios on JC Just Charts →

MNTS stock at a glance

Close · November 2, 2026
$1.82
Regular-session close; -6.19% versus $1.94 on October 30. USD.
Cash and equivalents
$107.598M
June 30, 2026 ·
Restricted cash, current
$0.106M
June 30, 2026; separate ·
H1 revenue
$3.240M
Six months ended June 30, 2026 ·
Q2 revenue
$0.025M
Three months ended June 30, 2026 ·
Operating cash use
$14.883M
Six months ended June 30, 2026 ·
Net loss
$17.749M
Six months ended June 30, 2026 ·
Net financing inflow
$109.942M
Six months ended June 30, 2026 ·

Where Momentus stands now

Momentus develops satellites, components and in-space services around its Vigoride orbital vehicle. The September proximity-operations demonstration and NASA formulation task order are distinct milestones: one validates a sensor suite in orbit, the other funds preparatory mission work. June cash resources provide capacity for further development, while modest and uneven revenue leaves the commercial model to prove. The investment case depends on repeat missions, customer retention, operating economics and capital discipline, with dilution and mission execution central to the risks.

Execution and funding. The adverse case is technical progress without sufficient commercial scale. Launch and mission delays can defer service delivery while payroll, engineering and corporate costs continue. Revenue remains small relative to spending, and future capital needs could create further dilution. A funded balance sheet extends development capacity; it does not guarantee customer growth, positive margins or value per share.

The constructive case

The favorable case combines flight-demonstrated capability, government engineering work and repeat payload missions. A larger cash reserve gives Momentus room to prepare future services and improve reliability. If each mission creates useful customer results and attracts additional paid work, the company could spread development and corporate costs across a larger revenue base. The key test is conversion into sustained, economically productive services.

The cautious case

The adverse case is technical progress without sufficient commercial scale. Launch and mission delays can defer service delivery while payroll, engineering and corporate costs continue. Revenue remains small relative to spending, and future capital needs could create further dilution. A funded balance sheet extends development capacity; it does not guarantee customer growth, positive margins or value per share.

Latest Momentus news

Nov 3, 2026

Momentus secures contract to host OQ Technology 5G payload on Vigoride-9 mission

OQ Technology has selected Momentus to fly its 5G Narrowband Internet of Things (NB-IoT) payload on the Vigoride-9 mission, scheduled for launch in Q4 2027. The hosted payload consists of an antenna, feeder board, and payload electronics integrated aboard the Vigoride orbital service vehicle. The payload is expected to provide services over a multi-month operational mission following deployment.

Oct 22, 2026

NASA FFR task order covers mission formulation

NASA selected Momentus as one of two participants for formulation of the FFR resupply mission. The agency intends to select one participant for implementation after that phase; a flight award remains a separate decision.

Oct 15, 2026

ARCSPACE welding payload signed for Vigoride 9

Momentus signed a commercial contract with ARCSPACE, a company focused on in-space servicing, assembly and manufacturing, to host an autonomous welding demonstration payload on the Vigoride 9 mission, currently projected to launch in 2027. The payload is to perform a series of autonomous welding operations in low Earth orbit and send data on weld quality, process stability and performance to engineers on the ground; Momentus provides power, communications, command and control and operational support under its hosted-payload service. The contract value was not disclosed. The mission already carries LASP's OWLS instruments, under a contract announced in June.

Sep 29, 2026

Vigoride 7 completes proximity-operations demonstration

Momentus announced completion of a rendezvous and proximity-operations demonstration with NASA's R5-S10 satellite, using optical, infrared and LiDAR sensing. The work was conducted under a previously awarded $1.86 million SpaceWERX contract. Solstar's Deke terminal supported communications and image transfer. The announcement also described Vigoride 8 as fully booked for a scheduled 2027 mission, with capacity available on Vigoride 9.

Sep 24, 2026

NASA task order supports FALCON-Lidar formulation

NASA awarded Momentus work for the competitive mission-formulation phase of FALCON-Lidar, an atmospheric-science initiative. A later contract to build and fly a satellite remains potential. Formulation work contributes to the company's government-services activity; a subsequent flight award would be a separate decision.

Aug 25, 2026

Equity purchase agreement with Yield Point terminated

Momentus reported that on August 21 it terminated its $50 million equity purchase agreement with Yield Point NY LLC. The company said it had never used the facility, does not intend to use it and paid no early-termination penalty. The at-the-market program with A.G.P. remains available.

MNTS stock catalysts and company milestones

  • 2027 mission windows — Vigoride 8 and Vigoride 9 missions; the November 3 release schedules Vigoride 9 for launch in Q4 2027. Formulation tasks remain distinct from an implementation award. Company mission expectations; no fixed launch day

Primary source · OQ Technology contract, November 3, 2026

October 22, 2026 — NASA task order for the formulation phase of the Fly Foundational Robots Resupply mission

NASA awarded Momentus a task order for the mission formulation phase of the Fly Foundational Robots (FFR) Resupply mission; Momentus is one of two participants selected. In this phase Momentus is to develop the concept of operations, technical interfaces and system design. Under the concept being evaluated by Momentus, a dedicated resupply spacecraft would carry a pallet of robotically enabled payloads from NASA’s TechLeap Prize challenge, then rendezvous, perform proximity operations and dock with the FFR spacecraft, whose robotic arm would transfer the payloads to the host platform. After the formulation phase NASA intends to select one of the two participants to move into implementation and fly the mission. The release does not disclose the value of the task order or a launch date.

Primary source

Cash resources: a stronger balance sheet creates a different development window

Cash and equivalents increased from $12.806 million at December 31, 2025, to $107.598 million at June 30, 2026. The June balance sheet separately reported $106,000 of current restricted cash. The increase reflects substantial financing during the first half, alongside cash spent on operations and other activities. This is a material change in the company's ability to fund development. It is also a historical reporting-date balance, rather than cash confirmed at the end of October.

The improvement matters operationally. A spacecraft business can have to fund engineering, procurement and integration well before revenue is earned. A larger reserve can help the company prepare a mission without depending on financing at every small development step. It can also improve continuity for customers and suppliers evaluating whether the service provider has the resources to complete its commitments. That financial capacity is valuable even while the business remains unprofitable.

Primary source

Merlintrader Health Score · $MNTS

2.80out of 5
Financial resources · 30%3.5

June cash materially improved development capacity; future spending and mission commitments remain relevant.

Catalysts · 30%3.0

Completed orbital work and a scheduled future mission provide tangible operating milestones.

Dilution · 20%1.5

The funding increase depended heavily on equity and related instruments.

Liquidity · 10%2.5

Nasdaq listing supports capital access, subject to available demand and future financing terms.

Execution · 10%3.0

The RPO demonstration is completed, while repeat commercial economics and future missions remain to prove.

Assessed Original assessment date not stated; historical assessment, not rescored. Weighted calculation: 3.5×30% + 3.0×30% + 1.5×20% + 2.5×10% + 3.0×10% = 2.80. This describes financial and operational robustness over twelve to eighteen months, not an investment recommendation.

Red flags

  • The adverse case is technical progress without sufficient commercial scale. Launch and mission delays can defer service delivery while payroll, engineering and corporate costs continue. Revenue remains small relative to spending, and future capital needs could create further dilution. A funded balance sheet extends development capacity; it does not guarantee customer growth, positive margins or value per share.
  • Company forecasts depend on execution and may change.
  • Financial balances retain their stated reporting date; later financing is separate.
  • Investment involves possible loss of part or all of the capital.

MNTS Stock FAQ: Momentus Questions Answered

When are Momentus’ Vigoride 8 and Vigoride 9 missions scheduled?

As of November 3, 2026, Momentus guided both missions to 2027. Its September 29 update described Vigoride 8 as fully booked and carrying two NASA payloads, without a fixed launch day. Vigoride 9’s customers include LASP’s OWLS payload, the ARCSPACE in-orbit welding payload and, under a contract announced November 3, an OQ Technology 5G NB-IoT payload; that release schedules Vigoride 9 for launch in Q4 2027 and does not disclose the contract value. Vigoride 8 schedule, bookings and NASA payloads. Vigoride 9 customer mission and projected timing. OQ Technology contract and Q4 2027 launch schedule.

How much revenue does Momentus make?

Momentus reported US$25,000 of revenue for the quarter ended June 30, 2026 and US$3.240 million for the first six months. Its services have different delivery, milestone and in-orbit performance periods, which affect revenue recognition. The first-half net loss was US$17.749 million, showing that the larger six-month revenue figure had not yet produced a profitable operating business. Quarterly and first-half revenue, net loss and recognition policy.

How much cash does Momentus have?

Momentus held US$107.598 million in cash and equivalents at June 30, 2026, with US$0.106 million of current restricted cash reported separately. First-half operating cash outflow was US$14.883 million, while net financing inflow was US$109.942 million. The enlarged reserve followed substantial financing, alongside continuing engineering, mission-preparation and corporate spending. Cash balances and six-month operating and financing cash flows.

Can Momentus issue more shares after ending its Yield Point agreement?

Yes: termination of Momentus’ unused Yield Point equity-purchase agreement on August 21, 2026 did not remove its other equity-financing channels. Its quarterly filing describes an ATM program, common-share issuance and warrants, and reported 21,963,401 Class A common shares outstanding at August 10. Future issuance or warrant exercise can change ownership, while the terminated facility itself is no longer available. Termination of the unused Yield Point agreement. Outstanding common shares, ATM financing and warrants.

When does Momentus report earnings?

As of November 3, 2026, Momentus’ next quarterly earnings date remained unconfirmed. Its latest complete quarterly accounts cover June 30, 2026, including the quarter and first six months. Current company announcements. Investor calendar. Latest quarterly financial statements.

What does Momentus do, and what is Vigoride?

As of November 3, 2026, Momentus develops satellites, satellite components and in-space services around its Vigoride orbital service vehicle. Vigoride supports transportation, hosted payloads and other orbital activities. The company also offers the platform as a satellite bus and describes a smaller Vigoride Lite version. Company business, Vigoride services, satellite buses and Vigoride Lite.

Was Momentus’ September SpaceWERX demonstration a new contract?

No: Momentus’ September 29, 2026 announcement reported completion of an orbital demonstration under a previously awarded US$1.86 million SpaceWERX contract. The work tested an AI-enabled lidar and imaging suite during proximity operations. This was a completed technical milestone under the existing award, providing flight experience for the company’s planned orbital services. Completed demonstration and original SpaceWERX award.

Do Momentus’ NASA formulation contracts guarantee a satellite flight?

No: Momentus’ September 24, 2026 FALCON-Lidar award covers competitive formulation work, with a later build-and-fly decision still ahead. Its separate October 22 Fly Foundational Robots Resupply task order also funds mission formulation. Momentus is one of two participants in that latter phase; NASA plans to select one participant for subsequent implementation and flight. FALCON-Lidar formulation and later competition. FFR formulation scope and subsequent selection.

Primary sources

Disclaimer. This content is published by Merlintrader for educational and informational purposes only. It is independent analysis and research. It does not constitute investment advice, an investment recommendation, an offer or a solicitation to buy or sell any security, and it is not a research report within the meaning of applicable United States securities regulation. Nothing here should be read as a recommendation to buy, sell or hold $MNTS or any other security.

Figures are taken from public filings with the U.S. Securities and Exchange Commission, company press releases and market-data providers, and are stated with their reference dates. Data can change without notice, and figures published before a results release become outdated the moment that release is issued. Merlintrader makes no representation that the information is complete or current at the time of reading. Readers should verify every figure against the primary source before acting on it.

Defense, space and technology companies carry procurement, execution, regulatory and financing risks. Government orders can be delayed or cancelled, production can exceed budget, export restrictions can limit sales, and acquisitions may fail to produce the expected returns. Contract announcements do not guarantee profitable deliveries or cash collection. Additional borrowing or equity issuance can increase obligations or dilute existing shareholders. Investors can lose part or all of their capital. Every reader is responsible for their own decisions and should consult a licensed financial adviser where appropriate.

Merlintrader may hold positions in securities mentioned. Some links on this page are affiliate or referral links, including those to Finviz and Stocktwits, which may generate a commission at no cost to the reader. Full legal information is available on the disclaimer and terms of use and privacy pages.